ACB logo   Home | News | Contact Us

Srpski | English  

Airport City Belgrade
0
Technical Information
0

General Technical Features

The reinforced concrete structure provides for thermal insulation against low and high temperatures.

Roof Areas are fully accessible and house the following mechanical plant areas:

Chilers and Fans

Generator

Ground floor houses the following mechanical plant areas:

Heating system

Transformator

Internal Finishing Works – complete finish of elevator, elevator lobby, ground floor lobby area, washroom facilities and stairs.

HVAC system

4 pipe fan coil units

External Facade

The facade combines double glazed curtain walling and aluminum cladding.

Landscaping

The area surrounding and directly behind the building has been designed as a fully landscaped area.

Lifts

4 No. passenger lifts travel with high class and spacious cabin

Safety and Security

Security System

Security services will be provided at all times. (24/7/365) CCTV monitoring system with dedicated security room housing, time lapse video recorders and monitors.

Safety

The building will be fully equipped with a fire detection system with a fully addressable heat and smoke detection system. All sanitary blocks are serviced with mechanical exhaust ventilation.

0

0

What is ACB? | News | ACB Team | Take a look | Technical Info | Contact
Copyright © 2007 Airport City Belgrade